- Perform the facility integration task to insure all interface issues are addressed.
- Assist the customer with preparing a test plan that assures all the test article development issues are addressed.
- Test article installation and hook-up in the test facility.
- Test article check-out and first run.
- Data acquisition verification.
- Execution of entire test plan.
Agilis has planned and conducted various types of testing for rigs and prototypes we have designed and built, including:
- Aircraft installed engine testing of a noise suppression mixing nozzle.
- Facility testing of a high efficiency gas turbine engine axial compressor.
- Facility testing of a catalyzed low emissions combustion system.
- Gas turbine engine testing of a catalyzed low emissions combustion system.
|
 |
|